60.5 F
San Diego
Friday, Oct 11, 2024
-Advertisement-

$12 Million in Stage, Facility Upgrades Under Way at Moonlight Amphitheatre

A reconstruction project for the city of Vista’s Moonlight Amphitheatre has broken ground with Sundt Construction as the design-build contractor for the $12 million project located at Brengle Terrace Park.

The project will increase accessibility for disabled patrons and upgrade site utilities. Aging and temporary stage facilities are being replaced with an enclosed stagehouse to include a fly loft, rehearsal room, dressing room and a workshop area. A lighting and sound canopy with acoustical treatment will top the 26-by-48-foot proscenium opening.

The stage area will measure approximately 3,500 square feet, which is 700 square feet larger than the current facility. A below-grade orchestra pit will also be added. The project is scheduled to be completed in June 2009.

– – –

Bilbro Construction has completed work on the new 22,000-square-foot visual arts and science complex at La Jolla Country Day School. Improvements include new tennis courts and a food pavilion. Renovations are valued at $10 million. The visual arts building features structural steel with a curtain wall composed of battered mullions and high-performance glass.

Interior features include studios for ceramics, graphic arts, and yearbook and video production. The interior spaces for the science laboratories include fume hoods, epoxy countertops and acid waste neutralization systems.

Bilbro will also break ground on a new kindergarten complex at the private school, which is scheduled to be completed next summer.

– – –

Framing has been completed on Wermers La Terraza Apartments, which were damaged or destroyed in last year’s wildfires. La Terraza is located at 10878 Poblado Road. The project consists of three buildings that are being completely rebuilt and four buildings that are being partially rebuilt. The project is owned by Alliance 1, and all phases are due for completion by the end of the year.

– – –

Johnson & Jennings General Contracting has upgrades under way at Club Motivate on the first floor of the Fahrenheit Condos/Padres Parkade at 1060 J St. The scope of work for the 3,200-square-foot project, valued at $300,000, includes construction of a new juice bar, locker and changing rooms, exercise and training stations, and a reception area.

– – –

Dynalectric Co. has announced the completion of electrical work for High Bluff Ridge, Sunroad Spectrum I, 707 Broadway, One America Plaza, Terraces at Copley Point and the Qualcomm AV Building. Each project consisted of various types of electrical work, including the installation of fire alarm systems, telecommunications-data systems, security systems and building access controls.

– – –

Johnson & Jennings General Contracting has completed construction for the new 3,230-square-foot branch office of San Diego National Bank located at 970 EastLake Parkway in Chula Vista. It’s San Diego National Bank’s second location in Chula Vista, and among 27 branches. The project scope entailed extensive interior renovation, including multiheight drywall ceilings, teller lines, teller stations and a private office.

, Compiled by Cassy Dump

-Advertisement-

Featured Articles

-Advertisement-
-Advertisement-

Related Articles

-Advertisement-
-Advertisement-
-Advertisement-